Montwood to Vista Hills Water Transmission Main
MCi Role: Prime Consultant East El Paso, Texas
Public Service Board/El Paso Water Utilities 13,000 lineal feet of 36" diameter concrete cylinder pipeline in Airport Pressure Zone with tie to 48” water transmission pipeline along Loop 375
Hydraulic analysis to equalize overflow elevations between system reservoirs – Vista Hills, Pebble Hills and Pico Norte
Highly urbanized area with schools, commercial and residential developments – performed routing analysis using Decision Plus computer software
48” steel casing boring under Zaragoza Road
Pipeline drawings, construction phasing, traffic control plans, specifications and cost estimates
Coordination with multiple jurisdictions including the Texas Commission for Environmental Quality, the City of El Paso and the Texas Department of Transportation
|